Langley AFB Team completes Runway (RW) 8/26 Outage in April as scheduled. The work involved installing a Displaced Threshold for RW 08, also replaced the RW 08 (Bar of 49 Lights) Threshold. The RW 08 PAPI (Precision Approach Path Indicator), TW Lights, RW Edge Lights, Junction Plazas, and new Duct Bank system and wiring were replaced. While working on the outage the Langley team dealt with poor weather. Congratulations to the Langley AFB Team for a job well done!