Atlantic Electric, LLC specializes in complex water and sewer projects. Today’s water and sewer projects require experienced project managers and engineers to handle submittals and supplemental engineering. Our crews are experienced in controls, PVC coated conduit systems, ductbank systems, VFD cables and controls, PLC control systems, and instrumentation systems.

Current Projects:

Rifle Range Road WWTP Rehabilitation and Expansion, Mount Pleasant, SC

March 2018 to Present, Subcontract Amount $7.9 Million+

Expand the wastewater treatment facility’s treatment capacity from 6 MGD to 9.2 MGD.  The electrical scope includes demolition and disposal of electrical items. Install temporary power for office trailers and temporary power and switchboard for the plant. Install disconnects for all 480V equipment.  Install main gate power and controls; ductbank, conduits, wire, manholes and quazite boxes; new conduit for SCE&G feeders; electrical gear including panelboards, transformers, enclosures, etc.; VFD’s with new wire and conduit; interior and exterior site lighting and switches; conduits and wire to equipment and lighting; instrument mounts and stands; grounding for all new structures; surge arrestors for power and controls at all panels; lightning protection, grounding and surge suppression. Provide concrete cutting and coring for electrical.  Relocate existing generator.  Install non-inline instrumentation; fiber optics and fiber optic patch panels.  Provide and pull all power and control wire and provide terminations.  Install a fire alarm system and panel for the IPS control building, power distribution center and blower dewatering building. Install hand switch stations and local control panels; wire and power for heat trace and power to HVAC units at control buildings 1 & 2.  Install and anchor electrical equipment.Provide/configure programming, software, OIT graphics for the SCADA control system.

Hanahan WTP Plate Settler Basins PH 1 and Solids Handling Improvements, Hanahan, SC

November 2016 to Present, Subcontract Amount $1.1 Million+

The contract consists of the construction of the Hanahan Water Treatment Plant plate settler basins phase 1 and solids handling improvements. The electrical work requires installation of temporary power and lighting; underground ductbanks, conduit, manholes, handholes including installation of electrical, telephone, data and video; aboveground and underground raceway systems; low and medium voltage wire and cable; new lighting systems and emergency lighting inverters; lightning protection and grounding systems; metallic and fiber optic communication cable and connectors; instrument stands; mounting of instruments and panels; install electrical gear and complete connections to equipment.

Completed Projects:

2014

Stoney Filter Rehabilitation, Hanahan Water Treatment Plant, Hanahan, SC

October 2014 to April 2017, Subcontract Amount $513,582

Dewatering Process Equipment Upgrade, Felix C. Davis WWTP, Charleston, SC

April 2014 to April 2015, Subcontract Amount $860,000+

2013

Red Top Regional Pump Station and Wastewater Interceptor Division 1, Charleston, SC

September 2013 to August 2014, Subcontract Amount $340,000+

Forest Trails WWTP Replacement, Isle of Palms, SC

August 2013 to January 2015, Subcontract Amount $1 Million+

2012

Center Street Wastewater Treatment Plant (CSWWTP) – Capacity Enhancements, Mt. Pleasant, SC

October 2012 to July 2015, Subcontract Amount $3.7 Million+

Pinewood Leachate Treatment System, Pinewood Hazardous Waste Site, Pinewood, SC

May 2012 to April 2013, Subcontract Amount $360,000+

2010 – Earlier

Ingleside Pump Station Expansion, North Charleston, SC

September 2010 to June 2011, Subcontract Amount $500,000+

Hanahan Elevated Water Tank, Hanahan, SC

January 2009 to May 2010, Subcontract Amount $330,000+

Hanahan WTP Phase 1 Filtration and Chemical Storage Improvements, Hanahan, SC

July 2008 to September 2010, Subcontract Amount $1.2 Million+